Sunday, December 10, 2006

Grout and About

We've taken a hill, in our overall battle for the house. It took us nearly all night, but we stand atop this rise and can see the remaining ground ahead. We're that much closer to being able to move in, because, really, a functional bathroom is an admittedly necessary thing. Almost as much as heat.

After much trial and tribulation (every battery for the two drills was in need of charging, we had to mix the grout partially by hand, and really, where do you stand when sponging a floor you just grouted?), we finally finished grouting the bathroom at 1 am. We also finished the plumbing - almost. The toilet works, the sink works (after a last minute mad dash to Lowe's, an hour away, last night), even most of the plumbing involved with the bath itself is functional. However, there is, as anyone else who also chose the self-punishing road of home renovation will expect to hear, one part missing. That one part, typically, is something Utterly Crucial, i.e, the threaded connector that serves to attach the tub faucet to the otherwise hideous and unattractive pipe.

At this point, we now have all the necessary things done. Much of what's left to do can be worked on after we move in, if need be. We are, realistically, two workdays (paint, plaster, tape and spackle, and maybe stripping the rest of the bedroom walls), and a cleanup day away from moving in. Christmas is now a realistic goal.

We find out next week when Chris goes. I hope we do get moved in before then.

No comments:

Post a Comment

Thanks for commenting! Comments are moderated, so do not be alarmed if your comment doesn't show up immediately.